Soaring Instruments - Tunnel Mount Installation
Parts

Panel Preparation
1. Tape plastic template to panel. (note: there are 4 holes on the top and 2 on the bottom)

2. Using the template as a guide, mark the mounting holes and scribe the Tunnel display opening.

3. Cut the Tunnel opening ( minimum dimensions - 3.62” x 5.28”) and drill mounting holes (5/32”). Only the top 2 holes are used in this example. The side 2 are unused.

Assembly Preparation
4. Attach 4 standoffs using 4 screws and washers as shown. Note: Any 2 of the top 4 tabs can be used. Any 2 of the bottom 3 tabs can be used. Bevel is on the top.

5. Place the ClearNav in the mount assmbly as shown. Then secure with rear mounting plate using 4 screws and 4 washers.


6. Mount assembly to panel.

7. Attach backing plate, nexus box and antenna.


|